303-980-1228

Project Quality

H2W assures technical + project quality of the highest order …

  • H2W Owners align with Client goals + objectives for project
  • H2W Owners perform critical technical work + plan + manage every job day-to-day … 
    …from project Kick-Off to Plant Start-Up
  • H2W Owners directly responsible / accountable for:
    • overall EPC planning + schedule
    • engineering schedule + cost control
    • process detail design
    • P&ID’s from KO to SU …no “hand-off“ of P&ID’s
    • technical support thru PSM
    • equipment + CV’s + PSV’s + Instruments procurement
    • Vendor drawings + equipment deliveries
    • physical design + 3-D model + PV&F BOM + piping stress analyses
    • IFC drawings
    • Construction competitive bidding + bid evaluation / conditioning
    • Construction check-out
    • Commissioning + SU planning …as integral part of Client team
    • technical support thru SU
    • “as-built” documentation

…high quality projects that meet Client goals:

  • no surprise last-minute “fixes” before SU
  • well planned / staged tie-ins …minimum shut-down duration
  • integrates well with existing facilities
  • plant performs as expected …or better than expected

…lead to “repeat” Clients for H2W …e.g.

  • DCP Midstream
  • Dominion Transmission
  • Equitable Resources
  • Kentucky Hydrocarbon
  • MarkWest Hydrocarbon
  • Suncor

specializing in plant upgrades …inside plants  operating  24/7 …

  • year 2000 …plant  upgrade-1 … 75MMSCFD  NGL recovery  J-T refrigeration + compression + flare
  • year 2008 …plant  upgrade-2 … 100MMSCFD NGL recovery cryo expander + FERC compression + 138KV sub-station + FERC residue P/L + new plant-wide PLC-based control system
  • year 2012 …plant  upgrade-3 … 150MMSCFD NGL recovery cryo expander + compression + 138KV sub-station expansion
  • year 2014 …plant  upgrade-4 … NGL product  bullets re-location
  • all four (4) upgrades implemented  in plant  operating  24/7