  • Existing NGL fractionation upgrade …to “double” frac thru-put / capacity
  • Upgrade existing DeC3 tower …re-trayed with high-capacity trays
  • New DeC4 tower …with high-capacity trays
  • Upgrade existing De-iC4 tower …re-trayed with high-capacity trays
  • New shop-built 3-tower Reflux skid c/w pumps

  • 3-D model of existing + new air-cooled over-head condensers
  • Upgraded existing + new air-cooled over-head condensers …to maximize frac capacity
  • Pipe-rack mounted

  • Upgrade existing NGL fractionation …Train-1
  • Add new NGL fractionation …Train-2
  • Setting new DeC4 tower …with high-capacity trays
  • Existing “spare” towers …re-tested + re-trayed + restored into service for frac Train-2

  • New frac Train-2  …”doubled”  existing frac capacity in Train-1
  • New shop-built water-cooled Condensers + Reflux skid c/w pumps
  • New DeC4 tower
  • New Cooling Tower “cells” …added to existing cooling water system

NGL Fractionation + A/G Product Storage

new ISBL NGL recovery plant for “high” C3 recovery …c/w DeC2 tower

  • Existing NGL fractionation upgrade …to “double” frac thru-put / capacity
  • Upgrade existing DeC3 tower …re-tray with high-capacity trays
  • New DeC4 tower with high-capacity trays
  • Upgrade existing De-iC4 tower …re-tray with high-capacity trays
  • Upgrade air-cooled over-head condensers …to maximize frac capacity
  • New electronic control system …for all the above
  • All upgrades implemented safely …inside plant operating  24/7 …with minimum  shut-down  duration

  • Upgrade process heat system …add new ~30MMBtu/hr. fired-heater + hot oil pumps
  • A/G product storage …add new NGL + nC4 + iC4 storage spheres